Second Ward, Minneapolis

This is a public policy forum that was established in 2006 by Minneapolis Second Ward (Green) City Council Member Cam Gordon and his policy aide Robin Garwood to share what they were working on and what life in City Hall was like. After serving 4 terms Cam lost his relection in 2021 but has continued to be involved in local politics and to use this forum to report and share his perspective on public policy. Please feel free to comment on posts, within certain ground rules.

Thursday, July 08, 2010

Reconstructing Riverside

Public Works is planning to reconstruct Riverside Avenue starting in 2011 and continuing until 2012. They have presented their initial plans at a meeting with the Seward and West Bank neighborhoods.


The plans include several positive changes: bike lanes from Franklin to 20th Ave S, bump outs in numerous locations, the capacity to make a left from eastbound Franklin onto Riverside and more.


However, there are also some aspects of the plans that I am concerned about, including a gap in the bike facility from 20th Ave to Cedar and a reduction of on-street parking. There are also some locations in which midblock refuge islands would help people, especially people with disabilities, cross the street safely. I am interested in exploring a “cycle track” model of bike facility, which creates a protected bike lane between the parking lane and the sidewalk. I have heard that the business community has concerns about the two-year construction timeline and about the loss of some on-street parking, and I am raising these concerns with staff.

0 Comments:

Post a Comment

<< Home